Retrofitting the Foundation Settlement of 400-Kilovolt Electricity Post Project Using ISCHEBECK Method and Element Analysis with PLAXSIS 3D Software

Retrofitting the Foundation Settlement of 400-Kilovolt Electricity Post Project Using ISCHEBECK Method and Element Analysis with PLAXSIS 3D Software

Mahdi Ghanavatian1 Abdolkarim Abbasi Dezfuli2

1) MS Student of Construction Engineering and Management, Islamic Azad University, Ahvaz, Iran,
2) Academic Staff Member and Assistant Professor, Department of Civil Engineering, Islamic Azad University, Ahvaz Branch, Iran,

IOI Code : XYBH-AZCCG
Publication : International Conference on Civil Engineering, Architecture and Cityscape(iccacs.com)
Abstract :
    Bandar-e Emam Khomeyni is located on the Southern coast of Iran in Khuzestan province, and enjoys a particular status from the aspect of development of projects in petrochemical industries. One of the problems with constructing structure foundations in the Petrochemical Special Economic Zone is that there are loose soil layers with low bearing capacity and high potential for settlement. Furthermore, raising low areas without considerable density of the levee in regions that have previously been firths has caused structures constructed on such soils to be exposed to settlement. Even structures with little load have encountered problems of this kind. The reason for this phenomenon has, first of all, concerned the density of the constructed levee mass and, secondly, occurred as a result of the consolidation settlement of the soft bed layers due to load resulting from a levee having occurred and occurring in the long run. The foundations of the towers and equipment established at the 400-kilovolt electricity post located at Fajr Petrochemical Company are not exceptions either, and some of them have experienced asymmetrical settlement and tilt of pedestals and structures. In the initial investigations of settlement correction, the consolidation micropile plan project with ISCHEBECK method was predicted. In this paper, with an investigation of the case study in the foundation settlement consolidation project of this project, investigation and control of buckling of micropiles required for electricity post foundation consolidation and analysis of finite elements with PLAXSIS 3D software in the mentioned project were addressed. These foundations have been damaged or exposed to damage. For this purpose, the status of the subsurface layers in the mentioned area has first been investigated, and in light of the results as well as available evidence from settlements having occurred, the geotechnical capacity bearing of micropiles and results of three-dimensional finite element analysis and settlement simulation are presented.

Keywords : settlement micropile foundation consolidation element analysis