Geotechnical studies and treatment plan: (Case study of khoshke-seil Dam)

Geotechnical studies and treatment plan: (Case study of khoshke-seil Dam)

Danial Mohammadzadeh Shadmehri1 Behnam Ghorbani2 Hamid Rajaee3

1) ferdowsi university of mashhad
2) ferdowsi university of mashhad
3) Sharif University of Technology

IOI Code : XYCC-ACBKG
Publication : International Conference on Science and Engineering(icesconf.com)
Abstract :
    In order to determine the characteristics and parameters of the layers of the ground at the site of any project engineering, geotechnical studies, including field investigations and laboratory tests carried out. These studies dams because of the special nature of and need for maintenance and long-term sustainability is of great importance. This article is geotechnical studies done for the dam rehabilitation project namin Ardabil examined. 4 boreholes in the project manual and 4 holes were drilled machine to check the status of the dam and assess the situation. Including penetration testing standard penetration test and tests on samples taken in accordance with the standards was conducted. According to tests carried out on the basis of the results of soil to a depth of 8.0 meters, the shell material, sand, silt and clay with a mixture of 8.0 meters to 15 meters depth compact and fine-grained clayey soil with Ultra-high viscosity and high density core of the dominant soil is hard and very stiff soil compaction takes place. Also, all samples were obtained from boreholes with very low permeability.

Keywords :