Considering the best seismic retrofit method of concrete buildings with the best standard assumption for decision-making from the perspective of management for construction
Considering the best seismic retrofit method of concrete buildings with the best standard assumption for decision-making from the perspective of management for construction
hamid deymouei1
1) iran-Azad University Bafgh - email:
IOI Code
:
XYCE-ACHCC
Publication :
International Conference on Civil Engineering, Architecture and urban infrastructure(icica.ir)
Abstract :
The present study intended to consider common methods of seismic retrofit of concrete buildings. First, to identify which retrofit method used more in the country and which standards are considered for choosing the method, an interview was done with active companies working in this area in a questionnaire form. Also, weights of decision-making standards for choosing the method were identified according to the scores specified by companies for middle group buildings. Then, by studying a four-floor building and increasing velocity of earthquake to 75%, seismic retrofitting of the building was considered that finally, by comparing some standards among three methods, using concrete shear wall was identified as the most suitable method than other methods.