Feasibility of applicability of TBM-excavated soil
Feasibility of applicability of TBM-excavated soil
Ali akbar kafash bazari1 hashem babaee2 seyyed mohamad sajadi atta3
1) Chief of Laboratory of reseach and development of Tehran cement co
2) M.A of Quality control of Padideh Shandiz city procect
3) Manegment of Laboratory of Mashhad urban railway2
IOI Code
:
XYCE-ADEDF
Publication :
International Conference on Civil Engineering, Architecture and urban infrastructure(icica.ir)
Abstract :
Specieficlly, the majority of tunnel excavation projects is the soil transpotation which is time-consuming, costly and difficult. In the other hand, most of the volume of the excavation in our country is mechanized and done by TBM, it’s soil having foam additive. As to this study, the potential use of the excavatied soil in Mashhad urban railway2 as a borrowed material for earthworks in the project. Hence, in order to estimate and compare the foam impact on mechanical parameter of soil, a series of exprements would be done on the related soil and the remolded samples. Use of Roller for compacting dike may damage structure. Moreover, compacting soil by hand, in 10-15 cm leyers, will be time-consuming. Therefore, filling the empty space behind the structure with this method would not be economical. In such cases, use of Limestone concrete would optimize time of performance and cost. This is better than earthwork and compacting that. So, with praparing some samples of soil mixed with limestone and cement, CBR and Uniaxial strenghth detemination experiments has been done. This research explains successful result of mixing Limestone and TBM-excavated soil
Keywords : excavated soil foam limestone strength concrete cement