THE OPTIMUM SUPPORT SELECTION BY USING TOPSIS METHOD FOR BEHESHTABAD WATER TRANSPORTING TUNNEL
THE OPTIMUM SUPPORT SELECTION BY USING TOPSIS METHOD FOR BEHESHTABAD WATER TRANSPORTING TUNNEL
mohammad amin ghasvareh1 Ramin Rafiee2 mahdi ghasvareh3
1) Student of Faculty of Mining, Petroleum and Geophysics, Shahrood University of
2) Assistant Professor, Faculty of Mining, Petroleum and Geophysics, Shahrood University of
3) Analysis PhD student Islamic Azad University of
IOI Code
:
XYDC-AFKKD
Publication :
International Conference on Researches in Science & Engineering(icrsie.com)
Abstract :
Among other factors playing fundamental roles in technical, economic, and safety justification of underground structures (particularly tunnels), one can refer to the choice of adequate maintenance system. Numerous parameters and criteria contribute into the selection of maintenance system for an underground space, so that conventional methods may fail to account for all of the factors when it comes to the design of the maintenance systems. With a horseshoe-shaped section of 6 m in diameter, the 65 km long Behesht-Abad Water Transfer Tunnel represents one of the largest water supply projects in Iran, with its aim been to transfer water to Central Iranian Plateau. Regarding the design and implementation of the project, the most important issue is the choice of adequate maintenance system to maintain stability of the rock mass while limiting the extension of plastic region around the tunnel. The present paper is aimed at using TOPSIS method to rank different alternatives in the order of maintenance system priorities for the tunnel. Ultimately, 20 cm thick, steel fiber-incorporated shotcrete maintenance system was selected as the best alternative.