GIS in the disign of the track

Vali Hesampourrazavi1

1) Iran-master of civil Highway

IOI Code : XYDK-AHAZH
Publication : International Conference On Research Science And Technology(restconf.com)
Abstract :
    One of the most expertise in the design and construction of the first and last track has been playing leading roles, Surveying Engineering is.Highway Engineering by Using the findings of Surveying Engineering and much progress in this field in recent years, while increasing the accuracy and speed of work, leads, resulting in reduced time and costs will be.Including the design of roads, railways, transmission lines, water, gas, power and reliable topographic maps need to be updated.Since that providing these kinds of maps directly in addition to the problems of bad weather and ground conditions, working hard, having to spend a lot of time and money The use of aerial photographs or satellite imagery of the region combined with land surveying and GIS In addition to the financial savings and comply with all design parameters are trip time.In this paper, we introduce and apply geographic information system (GIS) in defining, designing and implementing optimal route will be discussed.

Keywords : path planning transportation gis modeling spatial data