The Most Optimal Choice of Check Dam in Order to Floodwater and Sediment Control Using the Classical and Fuzzy Analytic Hierarchy Process - Case Study: Karaj River

The Most Optimal Choice of Check Dam in Order to Floodwater and Sediment Control Using the Classical and Fuzzy Analytic Hierarchy Process - Case Study: Karaj River

Shadi Saremi Pour1 Ata Allah Najafi Jilani2 Mahmoud Zakeri Neiri3

1) Master Student Of Construction Management, Eslamshahr Azad Univercity
2) Assistant Professor, Eslamshahr Azad Univercity
3) Assistant Professor, Eslamshahr Azad Univercity

IOI Code : XYEA-AKCDZ
Publication : The 4th International Congress On Civil Engineering, Architecture & Urban Development(4icsau.ir)
Abstract :
    Amended paragraphs are small structures in order to reduce the slope, drainage, reduction in stream flow and erosion control and use of materials such as wood, stone and mortar and lace are manufactured stones. These structures are widely in soil conservation and watershed management plans used by executive agencies in recent years and much of the cost is accounted for them. The aim of this study was to identify the best type of amendment for flood control and sediment to the river Karaj A questionnaire was distributed among experts to hierarchical methods of AHP and FAHP.

Keywords :