Investigation role of Time Management in executive cost minimization of construction project

Investigation role of Time Management in executive cost minimization of construction project

rouhollah latifi1 Seyed Meysam Khoshnava2

1) Iran Islamic Azad University, Sari
2) Iran Islamic Azad University, Sari

IOI Code : XYEA-BAAKF
Publication : The 4th International Congress On Civil Engineering, Architecture & Urban Development(4icsau.ir)
Abstract :
    The deficiency of proper time management is one of the major problems in construction scheduling development which is leaded to increase costs, reduce quality and delay in delivery of the project. This research focused in strategies of project cost reduction in term of time management through the technology. This research aimed to extend the finest time of executive activities for achievement the highest yields in the shortest time. The methodology of study was conducted by relying on techniques of operations research. The literature review used for shaping this research criterion, and the Multiple criteria decision making (MCDM) techniques considered to evaluate these criteria. The Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is a MCDM method which was considered to determine the option of a phased approach. It is based on the concept that the chosen alternative should have the shortest geometric distance from the positive ideal solution and the longest geometric distance from the negative ideal solution. The CL value is closer to ideal solution to answer is closer and better solution. According to the results, it can be concluded that the timing of the project is the best option.

Keywords : time management mcdm topsis construction schedule