Numerical Modeling of Umbrella Arch pre-Support Method for Shallow Tunnels in Loose Ground

Numerical Modeling of Umbrella Arch pre-Support Method for Shallow Tunnels in Loose Ground

Hadi Fazli1 Farshad Kaveh2

1) Assistant Professor, Civil Engineering Department, Payame Noor University, Tehran, I.R. of IRAN
2) B.s. Student, Civil Engineering Department, Payame Noor University, Tehran, I.R. of IRAN

IOI Code : XYEA-BABKA
Publication : The 4th International Congress On Civil Engineering, Architecture & Urban Development(4icsau.ir)
Abstract :
    In urban habitats, we generally encounter a loose ground and the tunnels should be aligned on those paths which result in minimum damage to tunnel structure, roads and other structures around the tunnel. This means that the surface settlements should be precisely controlled. The Umbrella Arch (fore-poling) method is a pre-support method employed in non-mechanized tunnel excavation in order to reinforce the ground or weak rocks and to restrict settlements. In this paper, a 3D model is developed using PLAXIS 3D-TUNNEL software, to investigate the behavior of umbrella method. This model is used then to evaluate the ground settlements in a real prototype tunnel (Hodogaya tunnel in Yokohama, Japan). The results obtained from the analysis are compared to the field records. The good correspondence between the results indicates great capability of the proposed model in predicting settlements resulting from tunnel excavation employing the umbrella Arch method.

Keywords : tunneling umbrella arch method forepoling loose ground pre support plaxis 3d tunnel