Using A Productive Human Resources Performance Measurement and Appraisal Model on Job-Shop Environment With Make To Order (MTO) and Make To Stock (MTS) Strategy
Using A Productive Human Resources Performance Measurement and Appraisal Model on Job-Shop Environment With Make To Order (MTO) and Make To Stock (MTS) Strategy
Morteza Biabani1 Davoud Sedighizadeh2
1) Ms.c Student of Industrial Engineering , Industrial Engineering Group, Industrial Engineering Faculty, Saveh Branch, Islamic Azad University, Saveh, Iran
2) Ph.d of industrial engineering , Industrial Engineering Group, Industrial Engineering Faculty, Saveh Branch, Islamic Azad University, Saveh, Iran
IOI Code
:
XYED-BAKBK
Publication :
The 4th International Conference on Management and Industrial Engineering(4icmi.com)
Abstract :
In manufacturing industries performance appraisalas a general term can be included activity types that organization follows function evaluation of its used resources especially human force through it. Always one of the major and discussable problems in any organization is created challenge between represented programs by production planning unit to production unit and lack of achieving to and implementing program by production unit and deviation from program on represented resources specially regarding to human force. The main purpose of this study which is result of research method based on experimental and field method in one active industrial organization in the field of manufacturing parabolic leaf spring is employee performance appraisal in one job-shop manufacturing system. For this reason , an innovative model of predicted man hour status is represented by production planning unit in job-shop manufacturing systems for implementing program regarding involved variables in lack of implementing of this program such as machine stoppages. Findings resulted from represented case study show that : considering the effective variables in using effective human force in product manufacture in one job-shop manufacturing system , we can calculate the rate pure hours of human forces present in production unit. As a result we can , consider to the rate of produced products by these personnel in calculated pure time duration, show a suitable approximate from function evaluation of human force present in production unit per unit of time.
Keywords : human force performance appraisal resources function job shop manufacturing system