Identification and classification of the factors affecting the creation of the delay in supply chain of construction projects in the Tourist-commercial regions (Case Study: Qeshm Island)
Identification and classification of the factors affecting the creation of the delay in supply chain of construction projects in the Tourist-commercial regions (Case Study: Qeshm Island)
Zahra Monzavi1 Ahmad Sadeghi2
1) MSc in Department of Industrial Engineering, trend productivity systems, Islamic Azad University, Science and Research, Qazvin, Iran, Email:
2) Assistant Professor Islamic Azad University of Qazvin, Faculty of Mechanical and Industrial Engineering, Department of Industrial Engineering, Qazvin, Iran,
IOI Code
:
XYED-BAKCH
Publication :
The 4th International Conference on Management and Industrial Engineering(4icmi.com)
Abstract :
In this study, a conceptual model based on a review of literature with eight independent variables and the dependent variable was drawn, the correlation hypothesis tests to evaluate their relationship was
That the results showed that the independent variables obligations of the employer, contractors, consultants, planning and scheduling, materials, equipment and environmental factors had a significant effect on the delay in the project. Then, by using importance index (MPI) and the relative importance (RII) prioritize each group of leading indicators showed and Top Rated both groups continue to hold a brainstorming session, Operating in the range of delays in construction projects reassessed from the perspective of Experts and was project management. Then the agents in the form of a questionnaire was compiled game risk factors identified in the study were weighted by AHP methods and their impact became clear. Then, as was previously mentioned, utilizes three methods MADM techniques AHP, SAW and prioritize the factors were ELECTERE. And given the heterogeneity of reports and rankings above mentioned methods to integrate the results and the average rating of the three methods, Borda and Copeland and ultimately, this integration results of the final report of the ranking factors developed and in the form of a final report by the employer to be found usability.
Keywords : project management causes of delay tourist constructional projects multi criteria decision