Statistical analysis of fracture rail and weld seam rails Railway Headquarters Zagros
Statistical analysis of fracture rail and weld seam rails Railway Headquarters Zagros
Mohsen Kheirollahi1 Mohamadreza Firuzkuhi2 abbas Arianrad3 Hossein Shahbaznezhad4
1) Expert Group responsible for monitoring the line and technical structures, Railway Headquarters Zagros, Iran
2) Deputy General Directorate of Technical and railway infrastructure Zagros
3) Expert Group on-line monitoring and technical structures Railway Headquarters Zagros
4) Expert Group on-line monitoring and technical structures Railway Headquarters Zagros
IOI Code
:
XYFE-BBDFB
Publication :
5th International Conference on Research in Science & Technology(5rstconf.com)
Abstract :
Abstract
Fractures, mainly due to factors such as fatigue rails, improper and inappropriate welding, heavy blows due to faulty rail transporter equipment (freezing machines), disability, etc. occur at Atsalyha In this study the statistics and rail fractures boiling in the range railway Headquarters Zagros between stations tight 7 to ANDIMESHK between 87 to 91 have been studied, has been trying to identify the causes of these fractures, a suitable way to reduce and minimize fracture should be provided. also block critical in terms of permanent failure to carry out reconstruction were identified.
Keywords : black welding rail joints rail fracture