A review of mining capacity operation and the effect of optimum cutoff grade in open pit mines
A review of mining capacity operation and the effect of optimum cutoff grade in open pit mines
Javad Lotfi Godarzi1 Aliasghar Khodayari2 Reza Khalo kakaei3 Mohammad Mansori4
1) MSc Student of Mining Exploitation, School of Mining, Collage of Engineering, University of Tehran, Tehran, Iran,
2) Associate Professor, School of Mining, Collage of Engineering, University of Tehran, Tehran, Iran
3) Professor, Shahrood University of Technology, Shahrood, Iran
4) MSc Student of Mining Exploitation, Imam Khomeini International University,Qhazvin, Iran
IOI Code
:
XYFE-BBDKB
Publication :
5th International Conference on Research in Science & Technology(5rstconf.com)
Abstract :
One of the most important parameters that have a direct effect on my planning is cutoff grade. Cutoff grade has an important effect on ultimate pit limit and as a consequence, net present value of a mine. Initial cutoff grade of a mine should be revised continuously due to the change that happens in mining costs, equipment performance, and processing plant through of the mine life which has a great effect on cash flows and optimum cutoff grade. In order to determine the optimum cutoff grade, net present value of a mine should be maximized. Because of that, in the initial stages of life of a mine, high grade ore should be extracted to achieve positive cash flows as soon as possible. Maximizing the net present value of a mine is a nonlinear programming which can be solved using numeric, analytical and intelligent methods.
Keywords : capacity planning cutoff grade net present value open pit mines