Modeling and solving a defective products recovering problem with considering the reliability constraint

Modeling and solving a defective products recovering problem with considering the reliability constraint

Mohammad Barzegar1 Seyed Hamid Reza Pasandideh2

1) M.Sc student , Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran -
2) Assistant Professor, Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran -

IOI Code : XYFE-BBEDC
Publication : 5th International Conference on Research in Science & Technology(5rstconf.com)
Abstract :
    In this research, a recovering facility with independent workstations to recovery the nonconforming products is investigated. We used remanufacturing and recycling acts to recovering the defects. Each remanufacturing station is modeled as an M/M/m/V queuing model with m and V being a decision variables. Also, each recycling station is modeled as an M/M/m queuing model with m being a decision variable. A single-objective integer nonlinear programming model trying to minimize the mean idle time of the machines is proposed to formulate the problem. The aim is to determine optimal number of machines in each workstation (remanufacturing and recycling stations) and capacities of remanufacturing stations. Since the problem belongs to the class of NP-hard problems, the Genetic Algorithm (GA) is utilized to find solutions. Because there is no benchmark available in the literature to validate the results obtained, the Imperialistic Competition Algorithm (ICA) is used as well. Finally, the applicability of the proposed model and the solution algorithms is demonstrated via some illustrative examples.

Keywords : recovery queuing approach reliability ica ga