Qualitative assesment in effective factors causing delays in road construction projects
Qualitative assesment in effective factors causing delays in road construction projects
pirouz rajabi nezhad1 siros radkeya2
1) ahvaz azad university, email:
2) ahvaz azad university, email:
IOI Code
:
XYGA-BCADH
Publication :
The 4th International Conference on Research in Civil Engineering, Architecture and Urban Planning and Sustainable Environment(4cauem.com)
Abstract :
Roads are the importanat substructions in our country and reserve high quality of development budget, therefore delay in road construction projects is very important. Delay in road construction projects is cause to cost overrun and also can damaged the country economy. Unfortunately in many road construction projects that performed in Iran, delays in high percent are accurating and even deep rooting in causing delays in road construction projects can not completely prevented the indication of delays in future projects. Therefore using the management method for decrease delays in road construction projects is very important and we should be care about it.
The purpose of this study is risk management of effective factors causing delays in road construction projects in behbahan-ramhormoz at Khuzestan province. For this purpose 47 factors were defined and a questionnaire was designed to rank the considered factors in terms of severity an frequency, and distributed between owner,consultant and contractor. With risk management method the results are analysed and 8 factors are specified as critical factors that have maximum effect on time overrun in projects and for each factor offer a suggestion for decrease or prevent it.
Keywords : risk management delay in road construction projects risk matrix critical factor