Identification and prioritization of the most important general and specific risks related to dams Using techniques AHP (case study: Haraz dam in Amol city)

Identification and prioritization of the most important general and specific risks related to dams Using techniques AHP (case study: Haraz dam in Amol city)

Hoseyn Izadi1 Mojtaba Fazeli2

1) Masters student Managment of natural disasters orientation, Martyr shahid Beheshti university of Tehran, Iran-www.sbu.ac.ir
2) Assistant Professor Department of Civil Engineering, Water and Environment, Martyr shahid Beheshti university of Tehran, Iran-

IOI Code : XYGC-BCEBH
Publication : 3rd International Conference on Management and Humanities(3icmhconf.com)
Abstract :
    Abstract: The storage dam Haraz is located in 20 km south of the city of Amol and under Construction on Haraz River. This dam is considered as one of the major civil projects in Iran, and undoubtedly the project will be faced with many problems from manufacturing to operation. Therefore, the purpose of this study is to identify and prioritize general and special risks related to the Haraz dam has been performed by using AHP technique. The tools used in this project are Delphi questionnaires that were evaluated in two stages by experts familiar with high-level (those who had doctoral degree). In this study, according to the previous record of dams in the country and the world, first, the general risks and especially were distinguished, then, 24 factors of general risks related to dams were evaluated based on the type of risk (Bio chemical safety and health physics and social, economic and cultural) in four separate table. Also, 10 special risks related to Hraz Dam were presented in one table in AHP1 questionnaire by 6 experts as pair-wise by two sub-criteria (intensity and frequency of occurrence). Then among 24 general risks, 10 risks were selected based on the weights obtained by Expert choice software. Among 10 special risks of dam, 6 risks were considered as the most important risks. In the last step, all risks (i.e. general and special risks) were evaluated by 5 experts based on three main criteria Project (effects on human society, environmental effects, effect on the economy) in the questionnaire AHP2. Finally, among 10 generic risks, 5 risks and among 6 special risk, 3 risks were identified and prioritized as the most important the general and specific risks of Haraz Dam obtained by weights.

Keywords : specific and general risks delphi questionnaire ahp haraz dam