Assessment of Industrial Projects with Using Fuzzy Multi-Criteria Decision-Making Method, Case Study: The Project of Construction of Tile Factory

Assessment of Industrial Projects with Using Fuzzy Multi-Criteria Decision-Making Method, Case Study: The Project of Construction of Tile Factory

Masoud Merati1 Abolghasem Alavi2

1) Department of Industrial Engineering, Najaf Abad Branch, Islamic Azad University, Najaf Abad, Iran
2) Department of Industrial Engineering, Najaf Abad Branch, Islamic Azad University, Najaf Abad, Iran

IOI Code : XYGF-BDDDH
Publication : 3th International Conference on management and industrial engineering(3icmi.com)
Abstract :
    One of the basic problems that exist in the long-term investments and industrial sector of organizations is how to evaluate and select industrial projects. Because choose a suitable and optimum project saves money and conversely, failure of a project leads to a waste of money and time and most unpleasant results will follow. Hence, the decision in this field is complex and several tangibles, intangibles, qualitative and quantitative factors are involved and therefore identify, study and analyze it is necessary. In this research technical and financial studies to evaluate projects were conducted and the results will be analyze. Technical studies include estimates of fixed investment costs, project revenues, costs prior to the operation, production costs and working capital and financial studies include indexes of net present value, internal rate of return, profitability index, payback period, breakeven point analysis and other major factors that will assist economic evaluation of the project. Case study in this study is the project of construction of tile factory. five projects t that are options of reaerch with various technical and economic indexes and factors are cosidered. These options with the help of fuzzy multi-criteria decision-making methods (fuzzy AHP) is compared to the best choice and rank the projects. Indexes consists of four cases: net present value, payback period, return on investment, return on sales and number break-even point. Result of research shows that output of ranking with this method is very close to ranking based on internal rate of return.

Keywords : project evaluation fuzzy multi criteria decision making fuzzy ahp tile factory