The analysis of construction and administration of dredging of Karoon River project between third bridge and Shaghayegh Park in the city of Ahvaz
The analysis of construction and administration of dredging of Karoon River project between third bridge and Shaghayegh Park in the city of Ahvaz
Payam Safarian1
1) MSc. Architecture, Shoushtar Azad University lecturer and Technical and executive deputy of Asapelbadr Company
IOI Code
:
XYKB-BHKFK
Publication :
2nd.International Conference on Civil Engineering, Architecture and Urban Design 31 Aug. 2017, Kasem Bundit University , Bangkok , Thailand(2iccacs.com)
Abstract :
Karoon River -as the longest river in Iran and the most significant economic infrastructure in the region- has a particular importance and influences the way of living in Khuzestan province both directly and indirectly. Massive volume of water and mud which flows annually in the basement of the Karoon River has led to the sedimentation of these materials and the creation of numerous islands; as a result continuous dredging of the river is considered to be a vital action for its revival and preventing from destructive effects of negligence in handling the related problems. In this regard, the project of dredging Karoon River -between the third bridge and Shaghayegh Park- was established in 2012 in the city of Ahvaz; although, some unpredictable problems stopped this project in 2014. The purpose of this applied-developmental study is to analysis of this national project by using a descriptive-analytical research method. Additionally, the author has intended to explain the process and achievements of this project by using library method; availing from existing documents about dredging operations; taking advantage of studies which were provided by the consultant of the project and utilization of collected field information during the implementation of the project by related contractor. The results of this study demonstrate that main objectives of the project have been finalized in accordance with specific conditions of that time frame; even though, existence of a number of unpredictable financial disputes and concerns that were not included in the early stages of the project led to disruption and eventually suspension of the project.
Keywords : karoon river analysis of construction and administration ahvaz dredging