Risk-taking in the management of construction projects in non-operating defenses
Risk-taking in the management of construction projects in non-operating defenses
hadi abooali1 heydar rajabi zeydanelo2 hooman barjoie roshan pour3
1) Civil engineering master student - Construction management, Islamic Azad University, Khomeini Branch
2) Urban-planning graduate student, Islamic Azad University of Mashhad
3) Ph.D. Student of Civil Engineering, Islamic Azad University, Bushehr Branch,
IOI Code
:
XYKG-CGCZZ
Publication :
International Congress on First International Conference on security, progress and sustainable development of border areas, territorial and Metropolitan,(icsp.ir)
Abstract :
In the era of globalization, there is no way to talk about risk, so that risk becomes an essential part of everyday life. There is a risk everywhere in every part of life. One of these sectors is the construction industry, so that the element s risk is always in the scene of a big puzzle. Effective risk management does not apply to risk regression, which is apparently the cheapest option. However, the main problem with this option is economic sensitivity. The identification of project risks is initially based on the type of project that may affect the project, as well as the indication of specific parameters and their likely likelihood of occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn supports three types of investment: risk priority, risk neutrality, specific risk aversion and measurement, because What is potentially profitable is, by definition, risky, and something that does not pose a risk is economically interesting and has no tangible benefits. Therefore, in relation to the implemented project, effective risk management is to find a middle ground in its management, which includes, on the one hand, the protection from risk in a negative direction by means of accurate identification and classification of risk, which leads to decomposition And comprehensive analysis. On the other hand, management should use all the mathematical and analytical tools to be based on the maximum benefit of these decisions. A careful analysis, taking into account all aspects of the companion, including stakeholder analysis, will allow us to add effective risk management to what will become the tangible benefits of our project in the future. . The result of risk identification and project analysis is a list of events that illustrates the cause and probability of an event, and the final assessment of its impact on the environment.
Keywords : risk management projects building non operating defense