Project Scheduling Using the Fuzzy Relationship Matrix of Activities with Limited Resources

Project Scheduling Using the Fuzzy Relationship Matrix of Activities with Limited Resources

mostafa zahedirad1 mehdi bashiri2

1) Master of Industrial Engineering at Iwanki University
2) Faculty of Shahed University

IOI Code : XYKG-CGDBH
Publication : International Congress on First International Conference on security, progress and sustainable development of border areas, territorial and Metropolitan,(icsp.ir)
Abstract :
    In this paper, the problem of scheduling a project under resource constraints (RCPSP) is compared using the Factor Dependency Matrix (DSM) in a fuzzy manner, with the problem of project scheduling, with the limitation of fuzzy sources in a real-world construction project. Initially, we present triangular fuzzy numbers and provide a timeline problem with resource constraints and in uncertainty terms based on history. Then it does not rely on the base model to reach the main goal, and it is proposed on the concept of the exchange of information or the dependency matrix of relationships. This modeling has the advantage of base modeling, which is the time it takes to exchange information. Finally, the two methods of modeling the problem of project scheduling under resource constraints in terms of the uncertainty of the duration of activities are derived from the past work history, along with the new modeling presented in this paper using a series of tests and tests on time intervals, the results are displayed. The results are compared with the exact RCPSP method in the presented history, and we will show that solving using the relationship dependency matrix overlaps the basic model and this mode has better performance than the base model at different time intervals in the solution.

Keywords : project scheduling resource constraints triangular fuzzy numbers duration of information exchange dependency matrix of relationships