Identify and evaluate the relationship between Factors Influencing The Reduction In Lead Time Kanban Parts In by using DEMATEL approach in Sapco
Identify and evaluate the relationship between Factors Influencing The Reduction In Lead Time Kanban Parts In by using DEMATEL approach in Sapco
Asadolah Asadpour Nigjeh1 Saeid Mafi Torabi2
1) Iran-Azad Qazvin University
2) Iran-Azad Qazvin University
IOI Code
:
XYZK-ZBZCD
Publication :
2nd. International Conference on Management & Industrial Engineering(2icmi.com)
Abstract :
With speed changes of market competition and short product life is also considering new strategies for satisfying customers needs is crucial. Reducing wait times at each step, the most important factor that a manufacturer can respond to these requirements. Reduce waiting times in the supply Kanban parts the most important step is to reduce waiting time. The purpose of this study is to identify the relationships between factors affecting supply Kanban Parts in the automotive industry is to reduce Lead Time. The present study uses a hybrid approach was used for statistical analysis and multi-criteria decision Dematel approach can be named as one of innovation research. This study, in SAPCO (Autumn 1394) was conducted. The population in this study is defined on two levels: the first level, in order to determine the factors affecting Lead Times in parts supply SAPCO of managers, directors and experts in charge of planning the number of parts supply SAPCO 22 of It is, were consulted. At the second level, to identify interdependencies factors affecting Lead Times in SAPCO parts supply, supply planning experts and decision ¬Gyrndgan SAPCO use that number was 19. In order to reduce the Lead Time factors affecting supply Kanban Parts with review of the literature and consultation with experts was extracted. The following factors are derived from surveys of experts and using average test were identified. The factors identified in three categories according to the type of suppliers, shipping, and customers were classified. Then, relationship factors were identified using Dymtl approach. Finally, proposals for reducing the waiting time in SAPCO was presented Kanban parts supply
Keywords : kanban supply lead time automotive dematel