Design of CCHP system for simultaneous production of heating and cooling system and electricity direction University complex in Gonbad Kavous city with RET Screen software

Design of CCHP system for simultaneous production of heating and cooling system and electricity direction University complex in Gonbad Kavous city with RET Screen software

pouyan ghanbari1

1) 1- Masters of Electrical Engineering Employee of Khuzestan Regional Electricity Company

IOI Code : XECZ-HFZDK
Publication : 2nd.International Conference on Architecture, Civil Engineering, Urban Development, Environment and Horizons of Islamic Art in the Second Step Statement of the Revolution(2icacu.ir)
Abstract :
    Given the importance of energy saving issues and the high share of energy consumption in industry, the use of effective methods in this regard will have significant effects on the development of any country. Co-generation of electricity and heat (CHP) as an efficient method to reduce energy consumption, is currently on the agenda of many developed countries and a significant share of electricity and heat production required in these countries, using this method In Iran, due to cheap energy and low share of energy costs compared to other costs in the household budget, so far no basic measures have been taken on how to consume energy and ways to reduce its consumption. But gradually, as the price of energy consumption, due to the globalization of the economy and trade, moves towards international prices and finds a higher ratio in the cost of the family, its consumption and waste is a waste of national capital and economic cycle. The country is harmed and the environment is endangered. Therefore, finding solutions to optimize energy consumption in power plants, which are one of the most consumed industries in the country, is of particular importance. In this article, the feasibility of the simultaneous production system of heating, cooling and electricity systems for the university complex in Gonbad Kavous city has been done using software. Supplementary cash is complementary electricity load of 8.0447 MWh and the amount of electricity exported to the grid is 52.995 MWh and the remaining electricity required is 731 MWh and the amount of heat recovered is 10.25 MWh and the efficiency is 53.5%. The useful life of the system is 20 years.

Keywords : concurrent production cooling and cooling electric building building