Integration of earned value management and Monte Carlo simulation for risk management in construction projects

Integration of earned value management and Monte Carlo simulation for risk management in construction projects

Hamed Majidi1 Alireza Asgari Serashgi2 Somayeh Radfar3 Zahra Qafaee4

1) M.Sc Student of Construction Engineering and Management, Faculty of Engineering, Islamic Azad University, Science and Research Branch, Tehran
2) M.Sc of Construction Engineering and Management, Faculty of Engineering, Payame Noor University, Karaj
3) M.Sc of Executive Management, Payame Noor University, Garmsar
4) B.Sc of Engineering Project Management, Faculty of Engineering, Khavaran Higher Education Institute, Mashhad

IOI Code : XYGD-BCGBG
Publication : The 5th International conference of Sciences and Engineering(5icesconf.com)
Abstract :
    One of the main concerns for construction project managers and stakeholders is the accurate awareness about project progress and calculation of timing and cost differences with real performance which are considered as project risk. Earned value management is one of the common methods for project risk management. On the other hand, one of efficient methods for estimation of construction risk that improve earned value management method is Monte Carlo simulation, this method can be used for more accurate risk analysis which lead to better cost estimation in construction projects. So the purpose of this study is an investigation on the integration of earned value management and Monte Carlo simulation method for risk management in construction projects. In order to this purpose, the required information through library studies which consist of survey of project s technical reports, documents, internal and external articles were collected and investigated. The results of this research show that integration of earned value management and Monte Carlo simulation would lead to better risk management and make it possible to analyze construction progresses more accurately by using related time and cost indicators.

Keywords : earned value management monte carlo simulation risk management construction projects library studies