Review and management of construction projects in the municipality (case study of Tehran)
Review and management of construction projects in the municipality (case study of Tehran)
parham Pourvahidi1 Mohammad Hossin Dadpor2 Nilofar Ghane3
1) Master s student in Construction Engineering and Management, Mehr Alborz University, Iran.
2) Faculty member, Mehr Alborz University, Faculty of Engineering and Construction Management, Iran.
3) PhD student in Civil-Structural Engineering, Kharazmi University, Iran.
IOI Code
:
AAHF-ABEGAA
Publication :
National Conference on Architecture and Art Technologies, Smart City, Soft and Creative Industries and Technological Culture(icact.ir)
Abstract :
One of the most important aspects of the issue in municipal construction projects is the way of interacting with contractors and contractor management models. Contractors, as the executive arm of urban projects, play a key role in achieving the time, financial, and quality goals of projects, but implementation experiences show that weaknesses in selecting, evaluating, directing, and controlling the performance of contractors are one of the main roots of inefficiency in metropolitan projects. The present study aims to investigate and manage the implementation problems of construction projects in Tehran Municipality and to provide management solutions based on an intelligent project control system. The present study showed that large construction projects in Tehran Municipality face a complex and multidimensional set of challenges that include management, process, contractor, human resources, and environmental factors. The type of research is considered to be applied from the perspective of the objective and descriptive-analytical from the perspective of the nature. This research seeks to solve a real problem in the field of urban construction project management, and its results can be directly used in improving the implementation processes, managerial decision-making, and policy-making in Tehran Municipality. In terms of implementation method, the present study is considered a case study that focuses on Tehran Municipality as a representative example of the country s metropolises and attempts to present local findings that are at the same time analytically generalizable to other similar cities. The findings emphasize that project performance depends on the simultaneous interaction of these factors and that partial correction or individual actions without considering the entire system cannot lead to sustainable improvement. In other words, the success or failure of large projects is the result of a dynamic interaction between contractor selection, bidding processes, monitoring, performance indicators, and environmental conditions. These findings emphasize that contractor selection should be based on operational history and actual capabilities, and not just on the bid price, as focusing solely on the lowest price can significantly reduce project quality. Analysis of bidding and monitoring processes showed that transparency and managerial accountability have a direct impact on reducing delays and cost deviations. The lack of transparent mechanisms for recording and evaluating contractor performance was one of the main reasons for project inefficiency. The use of balanced bidding processes, including qualitative and quantitative criteria, can reduce the risk of selecting inefficient contractors and create a healthy and accountable environment.
Keywords : performance local performance indicators transparency and accountability productivity improvement tendering