Designing a Comprehensive Performance Monitoring and Evaluation System for Civil Engineering Projects-Case Study: Shiraz Municipality

Designing a Comprehensive Performance Monitoring and Evaluation System for Civil Engineering Projects-Case Study: Shiraz Municipality

RezaKaviyani1 VahidZarei2

1) M.A. in Urban Management, University of Tehran
2) Master s student in Urban Planning, specializing in Regional Planning, Shiraz University

IOI Code : ABFG-ACZKHG
Publication : 12th.international Congress on Civil Engineering, Architecture, Art and Urban Development(12icsau.ir)
Abstract :
    Managing and evaluating the performance of urban projects—particularly in metropolises characterized by a wide array of mandates and initiatives spanning infrastructure, services, social programs, digital transformation, and safety—requires an integrated, transparent, and data-driven system. In the absence of such a system, data regarding projects, objectives, performance indicators, targets, actual performance, responsibilities, and corrective actions are typically maintained in a fragmented and inconsistent manner; this undermines report reliability, project comparability, the timely detection of deviations, and effective managerial decision-making. This article aims to present a comprehensive model for monitoring and evaluating the performance of Shiraz Municipality projects for the year 1405. The proposed model offers a coherent framework linking strategic goals, operational projects, key performance indicators (KPIs), quantitative targets, periodic monitoring data, performance status, and corrective actions. Within this framework, projects are categorized into four main groups: urban maintenance and civil defense; urban development; digital development and transformation; and urban resilience and security. Subsequently, general and specific indicators are defined for each project based on its nature, and the degree of goal achievement and actual performance is assessed using a weighted evaluation method. The performance calculation logic within this model accounts for the distinction between increasing and decreasing indicators; for instance, metrics such as the percentage of physical progress and the number of active users are measured using an increasing logic, whereas metrics such as travel time, hazard levels, and in-person visits are assessed using a decreasing logic. Furthermore, performance status is classified into three levels—critical, requiring attention, and optimal—and a process is established for defining, tracking, and evaluating corrective actions in cases where deviations occur. The outcome of this model is the creation of a framework that fosters operational transparency, accountability among responsible units, data coherence, and project comparability, while also identifying priorities for management intervention and strengthening evidence-based decision-making. This system can shift urban project management from fragmented, purely descriptive reporting toward continuous, analysis-driven, and improvement-oriented monitoring.

Keywords : performance management key performance indicator (kpi) project monitoring performance evaluation urban project management shiraz municipality corrective action data driven decision making