Examining and developing the model of contractual competencies of project managers in free trade zones (case study: Kish Free Zone Organization)

Examining and developing the model of contractual competencies of project managers in free trade zones (case study: Kish Free Zone Organization)

Mohammad Karimzadeh Khonighi1 Farhad Saeedi2 Saeed Yousefi3

1) Master of Architecture student, project management and construction, Tehran University, Kish International Campus Email:
2) PhD in Architecture, Project and Construction Management, Tehran University, Kish International Campus Email:
3) Postdoctorate in Architecture, Project and Construction Management, Tehran University, Kish International Campus

IOI Code : XEFB-HDCGA
Publication : 2nd International Congress on Civil Engineering, Architecture, Building Materials and Environment(caucong.com/2nd)
Abstract :
    Today, with the attitude towards the heterogeneity of the people involved in the construction industry during the process of a project, coupled with uncertainty about the surrounding aspects, the possibility of a dispute between the parties to the contract is inevitable. Experienced project managers, while mastering the terms and conditions of the contract, have a correct understanding of the claims of the parties and will act quickly and effectively in case of possible problems. . It seems that in the past, there has not been much study or investigation about the contractual competence of project managers in the construction industry in Iran. Based on the nature and method, this research used the descriptive method and from the perspective of the objective, it was of the applied type. In terms of typology, this research is among qualitative researches and in the paradigm of inductive analogy . The tool for collecting information was semi-structured interview . Further, in order to obtain research data, interviews were conducted with nine project managers of the construction industry in the study area, and the qualitative data obtained using the Maxqda 2020 software and The theme analysis method was coded. As a result, the findings from the interviews were analyzed from the three dimensions of competency type (technical-behavioral-environmental), competency component (knowledge-skill-attitude) and contract stage (contract-implementation-termination), which ultimately resulted in 37 contractual competencies. was identified in this research. At the end of the research, the general pattern of extracting and contractual competences obtained by project managers of the construction industry has been specified and described in this pattern.

Keywords : competence theme analysis contract project managers