blast preloading as a potential substitution for surcharge and vacuum Preloading in weak clay reclamation

Mohammad Mehdi Pardsouie1 Mehdi Mokhberi2 S.M.A Zomorodian3 Mohammad Hadi Pardsouie4

Abstract :
The common method for land reclamation consists of application of prefabricated vertical drains (PVDs), surcharge with or without vacuum preloading. Even by applying vacuum preloading, the time needed for compilation of the project is still considered long. In this literature a new method is introduced as a new preloading agent to accelerate the soil treatment process and decrease the cost and time required for the compilation of the reclamation process. Blast preloading might be a substitution or a companion for existing methods. It was shown that blast preloading has the potential to be used in soil treatment systems, as the required time was halved in many cases and the settlement increased from 20 to 50 percent, in comparison to cases without blast preloading. Even in cases in the absence of surcharge or vacuum, the blast preloading acts the same as surcharge or vacuum preloading.

Keywords : blast vacuum surcharge pvd clay


زبان مقاله : انگلیسی
محل انتشار : پنجمین کنفرانس ملی ژیوتکنیک و دومین کنفرانس بین المللی مهندسی زلزله و ژیوتکنیک لرزه ای
آدرس وب سایت کنفرانس : https://icesge.azaruniv.ac.ir/
کد IOI مقاله : XKCE-KFCCF
لینک مستقیم مقاله : https://isnac.ir/XKCE-KFCCF

سایر مقالات ارائه دهنده
  1. بررسی عددی تاثیر انفجار سطحی در افزایش فشار آب منفذی در خاک های اشباع نرم رسی
  2. بهسازی خاک های نرم و ضعیف رسی دریایی جهت احداث مجموعه واحد مسکونی ( مطالعه عددی )
  3. اهمیت در نظر گرفتن دانه‌بندی در انتخاب نوع مصالح پرکننده در ستون‌های ماسه‌ای و شنی و خرده‌سنگی
  4. پیشنهاد معیار جدید رده‌بندی و امتیازدهی سنگ‌های رسوبی جهت ارزیابی معادن و احداث موج‌شکن‌های جنوب ایران
  5. 2D Numerical Investigation of the Effectiveness of Surcharge and Vacuum Preloading Along with PVDs
  6. The effect of PVDs length on lateral displacement of embankments
  7. بررسی میزان افزایش کارآمدی سیستم های بهسازی خاک های نرم رسی در صورت اعمال پیش بار گذاری خلاء
  8. The acquisition of tampers quantity instead of compaction energy in time scheduling of DC and DR ground improvement operations
  9. Necessity of reconsideration of the evaluation process for sedimentary rocks used in construction of breakwaters in the south of Iran
  10. blast preloading as a potential substitution for surcharge and vacuum Preloading in weak clay reclamation
  11. مدل سازی عددی پروژه تحکیم خاک بستر واحد های زلال ساز بندر ماهشهر به وسیله سربار و زهکش های عمودی (بخش اول)
  12. بررسی میزان افزایش کارآمدی در صورت اعمال خلاء در پروژه های تحکیم خاک بستر به وسیله بار سربار ویا زهکش های عمودی (بخش دوم )