نمایش چکیده فارسی

Optimal Examination of Plant Grafting Using Relevant Equipment

YOUSEF TALEB1

Abstract :
Grafting is a horticultural technique of asexual plant propagation that involves joining parts from different plants together, allowing them to grow and function as a single organism. This method is particularly useful for plants that do not root easily from cuttings, for selecting plants with superior rootstock, or for maintaining a consistent, clonal production of certain varieties. Both professional nurserymen and fruit tree growers, as well as hobbyists, can benefit from learning grafting techniques. This guide explores the fundamental methods used to graft fruit trees and other plants that cannot be propagated by cuttings or seeds. In grafting, the portion of the plant chosen for propagation is called the scion, which typically consists of a shoot with several dormant buds capable of producing new stems and branches. The rootstock refers to the part of the plant that forms the root system of the grafted or budded plant. For the graft or bud to be successful, the cambium layers of both the scion and rootstock must align and merge. The cambium is a thin layer of actively dividing cells between the xylem and phloem, and it is essential for the generation of new growth. Grafting generally occurs in winter or early spring when the scion wood is dormant. Budding, a specific type of grafting, involves inserting a single, mature bud from the desired variety into the rootstock, ensuring contact with the cambium layer. This method is most commonly performed during the late summer months, typically from July to early September, although it can be done at other times. Budding is increasingly favored in fruit tree production due to its efficiency—making smaller, less intrusive cuts than traditional grafting, thereby saving time and resources. Additionally, budding allows for the propagation of many plants from a single rootstock, as it utilizes individual buds rather than larger sections of plant material. However, the primary drawback of budding is that it is limited to the growing season, typically when other labor-intensive tasks are also required. Although grafting and budding share similarities, the choice of method depends on factors such as the type of plant, the time of year, available materials, and the preferences of the grafter. For example, peaches, plums, apples, and pears are often propagated through budding, while apples and pears are more commonly propagated by traditional grafting techniques.

Keywords : grafting equipment tools efficiency


زبان مقاله : انگلیسی
محور مقاله : مهندسی کشاورزی
محل انتشار : سومین کنفرانس بین المللی پیشرفت های اخیر در مهندسی، نوآوری و تکنولوژی - بلژیک
آدرس وب سایت کنفرانس : eitconf.com/3rd
کد IOI مقاله : XKBA-AZKZDZ
لینک مستقیم مقاله : https://isnac.ir/XKBA-AZKZDZ
نمایش چکیده فارسی : https://isnac.ir/SA/XKBA-AZKZDZ

سایر مقالات ارائه دهنده
  1. Simulation, Analysis and Investigation of Effect Glass Cord on timing belts on pride and XU7 engines In Teeth separation from the Belts Using Johnson-Cook Equation and Finite Element ABAQUS Software
  2. Reinforced ShearConcrete Wall with Carbon Fiber Composite CFRP Under Bam Seismic Load with Using of Finite Element of ABAQUS Software
  3. Simulation, Analysis and Investigation of Reinforcing Concrete Shear Wall by Using CFRP Composite Mill Grid
  4. Finite Element Analysis of Steel Shear Wall Reinforced With CFRP Composite
  5. Effect of CFRP Composite Sheets on Cracks Growth Mechanism and Propagation in Steel Shear Wall Using Finite Element
  6. Simulation, Analysis and Evaluation of Progressive Collapse of Reinforced Concrete Structures Under Seismic Load Using Finite Element of ABAQUS Software
  7. Analysis and Investigation of Progressive Destruction In Six Floor Concrete Buildings Using Finite Element
  8. Stress-Strain Analysis and the Study of the Effect of Progressive Destruction on High-Concrete Structures Using Limited Finite Element
  9. Investigation and comparison of the amount of tensions applied on the timing belt at the moment of teeth separation from the bed in the Pride and xu7 engines in different materials of CR, HNBR and EPDM with various number of tensile members
  10. Simulation and Evolution of a New Seismic Flexural Connection System for Steel Structures
  11. Supply chain Flexibility and Operational Performance Influenced by Highly Involved Human Resource Manager Practices
  12. Configuration Approach for Supply Chain Management Practices (Supply Chain Agility and Sustainability Performance )
  13. Evaluation and Finite Element Analysis of the Airfoil of the Airplane Wing Under the Effect of Applied Fluctuating Load
  14. Impact of the Time of Product Presentation to the Market and Evaluating the Success of Product Development Due to the Phenomenon of Target Costing
  15. Experimental and Analytical Investigation of Roller Bearing Scaling Defect Based on Hertzian Contact Model
سایر مقالات محل انتشار
  1. خوشه بندی تصاویر رادار سار با استفاده از شبکه‌های عصبی مصنوعی
  2. Simulation, Analysis and Investigation of Friction, Mechanical properties and the Role of Plunger on Thickness Distribution in Hydro-Forming Process
  3. Polymeric Nanoparticles in Cancer Therapy: Drug Delivery through Controlled and Targeted Release- A Review
  4. Renewable Materials in Green Construction: The Role of Hempcrete and Other Sustainable Building Practices
  5. استفاده از انرژی خورشیدی در باززنده‌سازی بناهای تاریخی
  6. ارزیابی مسائل زیست محیطی در خصوص آودگی آب در جهت توسعه شهری
  7. بررسی نکات طراحی و ساخت برج Kingdom در کشور عربستان
  8. Exploring the Impact of Urban Management on Achieving Sustainable Urban Development
  9. The risk of pollutants and their impact on the environment - a review
  10. بررسی انواع بتن کاربردی
  11. نقد تدریس زبان انگلیسی در آموزش عالی و چگونگی بهبود تدریس زبان به کمک روش های نوین
  12. ارزیابی علل روانگرایی خاک و عوامل تشدید کننده آن
  13. Intelligent Energy Management Analysis for Thermal Comfort in Commercial Complexes
  14. کاربرد هوش مصنوعی در دینامیک سیالات محاسباتی بهینه‌سازی و پیش‌بینی عملکرد جریان‌های سیال
  15. Waste management in drilling operation