Modeling a novel resource-constrained project scheduling problem
B. Shah-Hoseini1 S.M.T. Fatemi Ghomi2 M. Karimi-Nasab3 Moeen Sammak Jalali4
Abstract :
This paper provides mathematical analysis for a resource-constrained project scheduling problem in two folds: mathematical formulation, and algorithm development. Correspondingly, the problem has some special assumptions such as (i) resources need a lag time after each use in order to have recovery/service, (ii) each activity can be compressed, and (iii) project available budget is limited. This problem is rarely analyzed in the literature especially for the case of dedicated resources, while we develop a special-purpose algorithm that defeats general-purpose solver Lingo 11.0 on different test problems. The proposed algorithm uses problem characteristics in the form of guiding rules efficiently. At the end, computational experiences are reported.
Keywords : project scheduling resource constrained activity compressibility budget
زبان مقاله : انگلیسی
محور مقاله : مهندسی صنایع
محل انتشار : دومین کنفرانس بین المللی مـــدیـــریــــت و مهندسی صنایع
آدرس وب سایت کنفرانس : 2icmi.com
کد IOI مقاله : XYZK-ZBZCG
لینک مستقیم مقاله : https://isnac.ir/XYZK-ZBZCG
سایر مقالات ارائه دهنده
- Interaction of Economic, Social, and Environmental indicators for Sustainable Development: A systems thinking point of view
- Lean Healthcare: Trends and forthcoming directions
- Modeling a novel resource-constrained project scheduling problem
- Comparison between individual and hybrid approaches for estimating fuzzy time series
- Performance evaluation of a production/distribution system: A graph theoretic approach
- Time series analysis of demand forecasting in Hybrid Make-To- Stock/ Make-To-Order production systems: current trends and future directions
- A graph theoretic approach towards performance measurement of a production/distribution system
- Time series analysis of demand forecasting for production planning in remanufacturing: current trends and forthcoming directions
- استفاده از سریهای زمانی در تشخیص زمان مناسب برای انجام فعالیت¬های نگهداری و تعمیرات در یک شرکت قطعه¬سازی خودرو، همراه با تحلیل عوامل موثر بر وقوع خرابی به کمک روش FMEA
- A heuristic approach for conflict recognition in hybrid make-to-stock/make-to-order production systems
- A System Dynamics analysis of Hybrid Make-To-Stock/Make-To-Order Production Environments
- A heuristic approach for performance evaluation of hybrid manufacturing systems
- Dynamic analysis of hybrid Make-To-Stock/Make-To-Order production systems
- Mechanisms for hybrid manufacturing systems: A closer look
- Artificial Intelligence in Production Planning and Supply Chain Resilience: A Structured Review of Decisions, Enablers, and Risks
سایر مقالات محل انتشار
- سازمانهای میانجی: تعاریف، انواع و کارکردها
- سنجش آمادگي استقرار سیستم مديريت ارتباط با مشتری(CRM) (مطالعه موردی: بانك ملي ایران- استان خراسان جنوبی)
- بررسی رابطه بین گرایش استراتژیک شرکت با عملکرد سازمانی با استفاده از مدل کارت ارزیابی متوازن (مطالعه موردی: شعب بانک مسکن تبریز)
- تاثیر مدیریت سود واقعی بر هزینه سرمایه سهام عادی
- آینده پژوهی تولید و عملیات، رهیافتی نو از مدیریت ارتباط با مشتری(CRM)
- طراحی کودکستان با نگاهی به نقش طبیعت در آموزش کودکان
- بررسی رابطه بین فرآیند بکارگیری وجذب دانش با ظرفیت تفکر استراتژیک
- بررسی نقش انگیزه پیشرفت بر اخلاق کاری اسلامی
- تأثیر دوره تصدی حسابرس بر تأخیر در ارائه گزارش حسابرسی
- The Impact of Corporate Governance Property on the Relationship between Product Market Competition and Profit Management
- تاثیر مدیریت دانش بر عملکرد سازمان¬های خصوصی ( مطالعه موردی بانک انصار شعب غرب تهران)
- EFQM scores evalution in Textile industry: A case study in Yazd Textile industry
- تاثیر رفتار غیر اخلاقی بر ارزش برند در صنعت بيمه
- ارائه یک سیستم خبره فازی جهت تعیین تأثیر آموزش و پاداش بر بهرهوري (مورد مطالعه دانشگاه آزاد اسلامی تبریز)
- تاثیر ریسک اعتباری بانک و عملکرد مالی بانک در بانک های پذیرفته شده در بورس اوراق بهادار مازندران